Track & adapt

Proof of work, checked before it’s covered up.

“Done” in a chat message isn’t proof — and once the plaster, concrete, or cladding goes on, nobody can check. Nodle gives every task a photo checklist timed before the work is hidden, checks the photos the crew sends, and hands the manager a short review brief instead of a camera roll.

Demo: the electrical foreman sends a voice message in Spanish; it is transcribed and translated — “Level 1, zone B conduits are in. Can someone check them?” Nodle replies with a photo checklist to complete before plastering. The first photo, an overview, passes two checks but the box entries are not visible, so Nodle asks for close-ups. The close-ups arrive, all three checks pass, and a review brief goes to M. Reyes for sign-off.

› A voice report, translated; the photo checklist; a retake before plastering; checks passed and a brief to the manager.

A checklist written for each task

Nodle reads the task — what the work is, what follows it, and what will cover it up — and writes what to photograph: a labelled overview for location and extent, then the close-ups that matter for that kind of work.

  • An overview that shows where the work is and how much is done
  • Close-ups of the details that matter for that trade
  • Timed before the next trade covers the work
  • Written in plain language for the crew

Checked on the spot

The crew posts photos in the task chat. Nodle checks them against the checklist — what passes, what is only partly visible, and what is missing — and asks for a specific retake when something important can’t be seen, while it can still be fixed.

The manager makes the call

When the checks pass, the manager gets a review brief with the photos and the findings. Minor notes travel with it. Crews can always send anyway, and the manager decides.

Frequently asked questions

How does photo verification work in Nodle?
Each task gets a photo checklist. The crew posts photos in the task chat, Nodle checks them against the checklist and asks for a retake if something important isn’t visible, and the manager receives a review brief to sign off.
Does AI approve the work?
No. Nodle checks the photos and flags gaps; the manager signs the work off. Crews can always send their photos anyway, and the manager makes the call.
Why does the timing of the photos matter?
Much of the work on site gets covered — by plaster, concrete, insulation, or cladding. Nodle times each checklist before the next trade hides the work, so the evidence is captured while it can still be seen.

Run your next build with Nodle.